Sl.No |
Name of Client, Address Tel. No., Tlx. No., Fax No. |
Execution Philosophy |
Scope of Contract And Location |
Parameters of Tank |
Duration of Contract |
Value of Work (Rs. In Lacs) |
Year of Completion |
1 |
BPCL-Kochi Refinery, Ambalamugal, Kochi |
DIRECT |
Repair of Tank -11 & 21 |
79mtr single deck floating roof tanks |
2 Yrs |
763.77 |
2017 |
2 |
BPCL-Kochi Refinery, Ambalamugal, Kochi |
DIRECT |
Rate Contract for Repair Jobs of Cone Roof at BPCL-Kochi Refinery |
Cone roof tanks |
2 Yrs. |
998.79 |
2016 |
3 |
IOT Anwesha Engineering & Construction Ltd., Vadodara- under EIL for BPCL-KR |
SUB CONTRACT |
Tankage construction work (Tankage work-III at IREP project BPCL-KR |
2nos of 79mtr double deck floating roof tanks and 2nos of cone roof tanks |
10 Months |
690.00 |
2016 |
4 |
Offshore Infrastructure Limited, Mumbai under EIL for BPCL-KR |
SUB CONTRACT |
Tankage Construction work (Tankage works-IV) at IREP project BPCL-KR |
1 nos of single deck floating roof tank & conversion of 2nos of floating roof tanks to floating cum cone roof tanks |
10 Months |
901.00 |
2016 |
5 |
NRP Projects Private Limited, Chennai |
SUB CONTRACT |
Civil and Mechanical works at BPCL, Irimpanam Installation IREP at Irimpanam |
Tank farm with floating roof and cone roof tanks |
8 Moths |
1336 |
2016 |
6 |
Paramount Limited, Vadodara under EIL for BPCL-KR |
SUB CONTRACT |
Construction of 4 Nos. site fabricated tanks for effluent treatement plant for IREP project of BPCL-Kochi Refinery |
4nos of Cone roof tanks |
6 Months |
105 |
2016 |
7 |
BBPCL-Kochi Refinery, Puthuvypin Project |
DIRECT |
Repair works on STT-10 |
79mtr double deck floating roof tank |
6 Months |
472 |
2016 |
8 |
BPCL-Kochi Refinery, Ambalamugal, Kochi |
DIRECT |
Rate Contract for Repair Jobs of Floating Roof Tanks (Above 60 Mtr. Dia) at BPCL-Kochi Refinery |
Repair of floating roof tanks with entire replacement of floating roof of 66mtr and 79mtrs dia |
2 Yrs. |
2063.42 |
2015 |
9 |
BPCL-Kochi Refinery, Ambalamugal, Kochi |
DIRECT |
Rate Contract for Repair Jobs of Floating Roof Tanks (Below 60 Mtr. Dia) at BPCL-Kochi Refinery |
Repair of floating roof tanks with entire replacement of floating roof of below 60mtr dia |
2 Yrs. |
1152.35 |
2015 |
10 |
BPCL-Kochi Refinery, Puthuvypin Project |
DIRECT |
Rate Contract for Fire Water Line modification at STF, Puthuvypin |
7Pipeline replacement for puthuvypin BPCL |
2 Yrs. |
248.88 |
2015 |
11 |
M/s.HPCL, Visakh Refinery Vishakhapatinam |
DIRECT |
Mechanical Repairs conversion of Single Deck to Double Deck to Double Deck FR and painting works on Crude Tank 120-T-01-D) 56 mtr. Single Deck Floating Roof |
79 mtr. dia |
12 Months |
428.9 |
2015 |
12 |
M/s. Chennai Petroleum Corporation Ltd.- Cavery Basin Refinery, Nagapattinam |
DIRECT |
Maintenance and Repair of 3 Nos. Naphtha/LSHS Storage Tanks |
Cone roof tanks |
15 Months |
185.00 |
2013 |
13 |
M/s. BPCL, Kochi Refinery, Ambalamugal Kochi-682 302 |
DIRECT |
Reconstruction of Tank-10 fabrication, erection, testing and painting of shell bottom single deck floating roof |
79 mtr. dia |
12 Months |
478.03 |
2012 |
14 |
M/s.HPCL, Visakh Refinery Vishakhapatinam |
DIRECT |
Design of Double deck Floating roof Crude Tank 120-T-01E 79 Mtr. Dia |
79 mtr. dia |
3 week |
9.00 |
2012 |
15 |
M/s.HPCL, Visakh Refinery Vishakhapatinam |
DIRECT |
Mechanical Repairs on Crude Tank 120-T-01E 79 Mtr. Dia |
79 mtr. dia |
15 Months |
309.00 |
2013 |
16 |
M/s. BPCL, Kochi Refinery, Ambalamugal Kochi-682 302 |
DIRECT |
Reconstruction of Tank-20 fabrication, erection, testing and painting of shell bottom single deck floating roof |
79 mtr. dia design, |
12 Months |
580.60 |
2012 |
17 |
M/s. BPCL, Kochi Refinery, Ambalamugal Kochi-682 302 |
DIRECT |
Repair of Tank-102 design, fabrication, erection |
44.5 mtr. Dia |
8 Months |
156.67 |
2013 |
18 |
M/s. BPCL, Kochi Refinery, Ambalamugal Kochi-682 302 |
DIRECT |
Repair Works of Tank 381 /100 / 250 |
2nos of floating roof tank and 1no of cone roof tank |
6 Months |
309.82 |
2013 |
19 |
M/s. BPCL, (E&P) South- Ongole Depot. |
DIRECT |
Repairs of TK 05 |
12 mtr. Dia single deck floating roof |
1 Months |
25.76 |
2011 |
20 |
M/s. Chennai Petroleum Corporation Ltd.- Cavery Basin Refinery, Nagapattinam |
DIRECT |
Repair works in Crude Storage Tank (13-TF.001C) |
56 mtr. Dia floating roof design, fabrication, erection, testing of single deck Floating roof tank including painting |
6 Months |
262.93 |
2011 |
21 |
M/s. BPCL, Kochi Refinery, Ambalamugal Kochi-682 302 |
DIRECT |
Reconstruction of Tank-18 |
79 mtr. Dia , design, fabrication, erection, testing of single deck Floating roof tank including painting |
12 Months |
629.36 |
2011 |
22 |
M/s. BPCL, Kochi Refinery, Ambalamugal Kochi-682 302 |
DIRECT |
Reconstruction of Tank-23 |
79 mtr. Dia , design, fabrication, erection, testing of double deck Floating roof tank including painting |
12 Months |
622.56 |
2011 |
23 |
M/s. BPCL, Kochi Refinery, Ambalamugal Kochi-682 302 Client: EIL |
DIRECT |
Air Fin Coolers |
Fin for coolers |
1 Months |
27.72 |
2010 |
24 |
M/s. BPCL, Kochi Refinery, Ambalamugal Kochi-682 302 Client: EIL |
DIRECT |
Tankage works on CEMP Ph-II |
7 nos. Cone roof Tanks |
6 Months |
430.29 |
2010 |
25 |
M/s. BPCL, Kochi Refinery, Ambalamugal Kochi-682 302 |
DIRECT |
Repair of Tank-90 |
30.48 new floating single deck, roof design, fabrication, erection, welding testing |
8 Months |
115.43 |
2010 |
26 |
M/s. Chennai Petroleum
Corporation Ltd.
Manali, Chennai-600 068 |
DIRECT |
Repair and Maintenance work of Tank 20D-107 |
79 mtr. Dia , design, fabrication, erection, testing of double deck Floating roof tank including painting |
7 Months |
227.21 |
2009 |
27 |
M/s. BPCL, Kochi Refinery, Ambalamugal Kochi-682 302 |
DIRECT |
Reconstruction of Tank-24 |
79 mtr. Dia , design, fabrication, erection, testing of double deck Floating roof tank including painting |
8 Months |
424.83 |
2009 |
28 |
M/s. Tamilnadu Petroproducts Limited, Chennai |
DIRECT |
Replacement of Fixed Roof plate of Paraffin Tank-1919A |
14 mtr. Dia cone roof |
3 Months |
21.00 |
2009 |
29 |
M/s. Chennai Petroleum
Corporation Ltd.
Manali, Chennai-600 068 |
DIRECT |
Repair and Maintenance work of Tank 20D-106 |
79 mtr. Dia , design, fabrication, erection, testing of double deck Floating roof tank including painting |
7 Months |
203.39 |
2008 |
30 |
M/s. BPCL, Kochi Refinery, Ambalamugal Kochi-682 302
Consultant : EIL |
DIRECT |
Tankage works for CEMP Ph-II |
36 mtr. Dia cone roof -1 no., 34.3 mtr. Single deck FR-2 nos, 21.1 mtr. Dia DDFR-1 no., 30 mtr. Dia DDFR 2 nos. Total constructions including foundations |
15 Months |
1752.85 |
2009 |
31 |
M/s. Chennai Petroleum
Corporation Ltd.
Manali, Chennai-600 068 |
DIRECT |
7 Nos. Cone Roof Tanks |
Total design and reconstructions of various sizes |
7 Months |
130 |
2008 |
32 |
M/s. BPCL, Kochi Refinery, Ambalamugal Kochi-682 302 |
DIRECT |
Repair of Tank-331 |
30.48 mtr. Dia single deck, floating roof cum cone roof tank |
7 Months |
215.15 |
2008 |
33 |
M/s. BPCL, Kochi Refinery, Ambalamugal Kochi-682 302 |
DIRECT |
Construction of New MTO Tank-440 & 450 with piping and civil work |
height single deck floating roof tank, design, fabrication, erection, welding, painting |
15 Months |
239.91 |
2008 |