Sl. No. |
Name of Client, Address Tel. No., Tlx. No., Fax No. | Execution Philosophy | Scope of Contract And Location | Parameters of Tank | Duration of Contract | Value of Work (Rs. In Lacs) | Year of Completion |
---|---|---|---|---|---|---|---|
2 | 3 | 4 | 5 | 6 | 7 | 8 | |
1 | Thyssenkrupp Industrial Solutions(I) Pvt. Ltd. | SUB CONTRACT |
Decommissioning, inspection / re- commissioning of existing 12500 MT ammonia storage Tank-Coromondel International Ltd.- Ennore, Tamilnadu |
--- | 3.5 Months | 106 | 2022 |
2 | Hindustan Petroleum Corporation Limited | DIRECT | Construction of Culvert CBOT at HPCL, Cochin Terminal | --- | 2 Momnths | 157 | 2022 |
3 | Chennai Petroleum Corporation Limited, Manali | DIRECT | ARC for Repair works of Floating Roof Tanks at CPCL-Manali | --- | 24 Months | 618.61 | 2021 |
4 | Chennai Petroleum Corporation Limited, Manali | DIRECT | ARC for CR Tank repair works Group-2 of diameter less than 35 metrs.at CPCL-Manali | -- | 24 months | 610 | 2021 |
5 | BPCL-Kochi Refinery, Ambalamugal | DIRECT | ARC for Miscellaneous Civil Works at various Locations in BPCL-KR | --- | 12 Months | 171.13 | 2021 |
6 | BPCL-Kochi Refinery, Ambalamugal | DIRECT |
Rate Contract for 18 Months for the Repair Tank YT-100 & YT-905 at BPCL-Kochi Refinery |
30.48M Dia x14M Ht 34.3M Dia x15M Ht |
18 Months | 263 | 2021 |
7 | BPCL-Kochi Refinery, Ambalamugal | DIRECT |
TANKAGE WORKS FOR BS-VI MS BLOCK PROJECT OF M/s BPCL KOCHI REFINERY |
35M Dia x17.1M Ht 18M Dia x16.5M Ht With new Almn. IFR |
16 Months | 1,061 | 2020 |
8 | Anwesha Engineering Projects Ltd., Vadodara | SUB CONTRACT | Tankage Works Part-B for Acrylate Unit & Offsite of PDPP of BPCL-Kochi Refinery |
EPC of Tanks 27 nos. CR/FCCR with sizes 4 mtr dia x 6 mtr. Height to 21.40 mtr dia x 18 mtr. Ht. |
14 Months | 5712 | 2020 |
9 | Offshore Infrastructure Ltd., Mumbai | SUB CONTRACT | Tankage Works Part-A of PDPP of BPCL-Kochi Refinery |
Re-construction, modification of various dia tanks (9 nos.) |
14 Months | 398.80 | 2020 |
10 | BPCL-NTPC-Kayamkulam | DIRECT | Tank modification and repair works for T-402B | 32M Dia x15M Ht | 6 Months | 322.69 | 2018 |
11 | BPCL-Kochi Refinery, Ambalamugal, Kochi | DIRECT | ARC for Repair of YT-60, 70 & 101 |
30.4M Dia x14.1MHt 30.4M Diax12.4M Ht 32.3M Dia x14M Ht |
12 Months | 245 | 2019 |
12 | BPCL-Irimpanam Installation | DIRECT |
Hot works in above ground tank No.07 |
38M Dia x20M Ht | 8 Months | 302.54 | 2018 |
13 | Chennai Petroleum Corporation Limited, Manali | DIRECT | Repair works on Crude Tank (20-D-111) | 79M Dia x14.4M Ht | 7 Months | 375.91 | 2017 |
14 | Chennai Petroleum Corporation Limited, Manali | DIRECT | ARC for Repair works of Cone Roof Tanks less than 35 mtr. dia |
|
24 Months | 339.87 | 2018 |
15 | BPCL-Kochi Refinery, Ambalamugal, Kochi | DIRECT | Repair of Tank YT103 | 45.8M Dia x14M Ht | 12 Months | 180.83 | 2019 |
16 | BPCL-Kochi Refinery, Ambalamugal, Kochi | DIRECT | Repair of Tank -11 & 21 |
60.9M Dia x14.5M Ht 79M Dia x14.4M Ht |
24 Months | 763.77 | 2017 |
17 | BPCL-Kochi Refinery, Ambalamugal, Kochi | DIRECT |
Rate Contract for Repair Jobs of Cone Roof at BPCL- Kochi Refinery |
|
24 Months | 998.79 | 2016 |
18 |
CPCL-CBR Nagapattinam |
DIRECT |
Maintenance and Repair works of Tank-13-TF-01B, 14-TF-04A & 14-TC-01E |
|
6 Months | 193.00 | 2016 |
19 | IOT Anwesha Engineering & Construction Ltd., Vadodara | SUB CONTRACT | Tankage construction work (Tankage work-III at IREP project BPCL-KR |
79MDia x14.3M Ht 18.3M Dia x 15M Ht 12M Dia x 11 M Ht |
10 Months | 690.00 | 2016 |
20 | Offshore Infrastructure Limited, Mumbai | SUB CONTRACT |
Tankage Construction work (Tankage works-IV) at IREP project BPCL-KR |
|
10 Months | 901.00 | 2016 |
21 | NRP Projects Private Limited, Chennai | SUB CONTRACT | Civil and Mechanical works at BPCL, Irimpanam Installation IREP at Irimpanam |
47 M Dia x 18 M Ht 38M Dia x 18 M Ht. 24.3 M Dia x 12M Ht |
8 Moths | 1336 | 2016 |
22 | Paramount Limited, Vadodara | SUB CONTRACT |
Construction of 4 Nos. site fabricated tanks for effluent treatement plant for
IREP project of BPCL-Kochi Refinery |
|
6 Months | 105 | 2016 |
23 | BPCL-Kochi Refinery, Puthuvypin | DIRECT | Repair works on STT-10 | 79M Dia x18M Ht | 6 Months | 472 | 2016 |
24 | BPCL-Kochi Refinery, Ambalamugal, | DIRECT | Repair of Tank-395 | 43.5M Dia x14.55M Ht | 6 Months | 86.58 | 2016 |
25 | BPCL-Kochi Refinery, Ambalamugal, | DIRECT | Repair of Tank-60 | 30.48M Dia x14.1M Ht | 6 Months | 95.39 | 2016 |
26 | BPCL-Kochi Refinery, Ambalamugal, | DIRECT | Repair of Tank-703 | 21M Dia x12.48M Ht | 2 Months | 14.90 | 2016 |
27 | BPCL-Kochi Refinery, Ambalamugal, | DIRECT | Repair of Tank-380 | 36.58M Dia x13.75M Ht | 3 Months | 47.28 | 2016 |
28 | BPCL-Southern Region - Irimpanam | DIRECT | Mechanical works for TK.2,4,6,7,29 & 13 |
|
3 Months | 105.25 | 2016 |
29 | BPCL-Southern Region-Irimpanam | DIRECT | Comprehensive Repair of TK-21 | 38M Dia x 20 Mtr Ht. | 4 Months | 115.42 | 2015 |
30 | BPCL-Kochi Refinery, Ambalamugal, Kochi | DIRECT |
Rate Contract for Repair Jobs of Floating Roof Tanks (Above 60 Mtr. Dia) at BPCL-Kochi Refinery |
--- | 2 Yrs. | 2063.42 | 2015 |
31 | BPCL-Kochi Refinery, Ambalamugal, Kochi | DIRECT |
Rate Contract for Repair Jobs of Floating Roof Tanks (Below 60 Mtr. Dia) at BPCL-Kochi Refinery |
--- | 2 Yrs. | 1152.35 | 2015 |
32 |
BPCL-Kochi Refinery, Puthuvypin Project Mr.Manikandan |
DIRECT | Rate Contract for Fire Water Line modification at STF, Puthuvypin | -- | 2 Yrs. | 248.88 | 2015 |
33 | M/s.HPCL, Visakh Refinery Vishakhapatinam Mr.M.N.Rao | DIRECT |
Mechanical Repairs conversion of Single Deck to Double Deck to Double Deck FR
and
painting works on Crude Tank 120-T-01-D) 56 mtr. Single Deck Floating Roof |
79 mtr. dia | 12 Months |
|
2015 |
Concurrent Commitments (As on 15-02-2023) | |||||||
SR. No. |
Full Postal Address of Client | Description of the work | Value of Contract in Lakhs | Date of Commencement of work | Schedule Completion Period |
% Completion as on date |
Remarks |
---|---|---|---|---|---|---|---|
1 | Chennai Petroleum Corporation Limited, Manali | Rate Contract for Carrying out Repair Works of Cone Roof Petroleum Product
Storage Tanks of
diameter less than 35 mtrs. at CPCL, Manali Refinery for Group B |
362.37 | 15.05.2021 | 36 Months | 90% | |
2 | Chennai Petroleum Corporation Limited, Manali | Repair Works on Crude Tank-20-D-117 at CPCL-Manali | 740 | 05.11.2021 | 10 Months | 92% | Workfront delayed, Time Extension granted |
3 | Thyssenkrupp Industrial Solutions(I) Pvt. Ltd. | 5000 MT Amonia Storage Tank Project for KFL Shahjanpur, UP. | 491 | 27.10.2021 | 11 Months | 100% | Workfront delayed, Time Extension granted |
4 | Indian Oil Corporation Limited | Design, fabrication, erection, welding, testing, calibrating, painting and
commissioning of
mild steel vertical Internal Floating Roof Tank (IFRVT) 10 M dia x 9M height for
ethanol storage
including sand pad foundation, piping & allied works at IOCL Kozhikode Depot, Feroke, Kerala |
175 | 25.02.2022 | 8 Months | 45% | Hold for client approval |
5 | Toyo Engineering India Private Limited, Mumbai-78 | Structural, Tankage, Mechanical & Piping works for 10000 MT Ammonia Storage Terminal at FKAT Project at FACT Ambalamedu, Kochi, Kerala | 1242 | 22.09.2022 | 12 Months | 50% | |
6 | BPCL-KANDLA INSTALLATION | HSD JETTY PIPELINE SUPPORTS REVAMPING FROM NAKTI BRIDGE TO IFFCO MAIN GATE AREA | 190.55 | 25.11.2022 | 3 Months | 100% | |
7 | BPCL-Kochi Refinery | CONTRACT FOR M&I REPAIR JOBS OF YT102 & YT370 | 211.85 | 16.01.2023 | 4 Months | 80% |
Arki Architecture is a New-York-based studio practice focused on modern design, interiors and landscapes. From our inception in 2007, we have delivered exceptional public. As a full-service firm.
2334 Peterson Street
Kingston UK London
T. +44 1123-2234-21
E. [email protected]